What's new
QC before stock: new pieces wait until quality check accepts them
Switch on QC and newly tagged pieces wait as Awaiting QC instead of going straight into stock. QC staff accept them (correcting weights if needed), reject them with a reason, or send them back for retagging.
In many showrooms, new pieces are checked before they reach the counters: weight, purity, stones, finish. With QC on, RMK Billing keeps them out of stock until that check is done.
- 1Settings → QC before stock: switch it on (owner).
- 2Give the QC person the QC permission in Settings → Staff.
- 3Tag new pieces as usual. The supplier bill is still entered at tagging; if you already entered it in Purchases, just pick it.
- 4QC opens the QC screen, checks each piece and accepts it (correcting weight or other details if needed), or rejects it with a reason.
What happens to each piece
- Awaiting QC pieces can't be billed, reserved or moved, and don't show in the online store.
- Accepted pieces go into stock; a corrected detail is kept in the piece's history (“Gross weight 4 → 4.1”).
- Rejected pieces can be retagged and sent back to QC, or deleted: the line comes off the supplier bill.
